Electricity Meter Installation

Electric meters are a great way to track your power usage. They can also aid in reducing your electricity bills.

They are usually a transparent glass-encased metering device which resembles the size of a mason jar. They come with five dials and an enormous rotating wheel that measures kilowatt-hours of electricity.

The Feeder Side

The most crucial part of the installation of an electricity meter for homeowners is the feeder. This is because it is connected to the complete electrical service. This area of the meter base is where the power from the utility company gets attached to the meter itself and the wires that connect it to the other electrical components of your home's system. In this area, install Outdoor socket you'll find the most obvious wire connections: hot, neutral and install outdoor socket ground. The best part is that the utility company will typically provide the meter and the necessary wiring, but the job of making it all work is up to you.

You will need to assemble the top-notch base for your meter. The first thing you should do is determine the meter's direction (left or right hand front) and then take a measurement of the length of the three wires you're planning to connect to it. Telescoping measuring tapes are the most effective tool for doing this. Be sure to wear gloves.

The Load Side

The load side of an installation electricity meter is where the incoming electric feed leaves the meter, and is then fed into the main service panel. This feed could come from an individual breaker or multiple circuit breakers within the main panel. The connection to the load is typically located at the bottom two load terminals on the hot bus bars on the meter however, it can be accomplished with an interim disconnect (See Figure 3).

The conduit that connects the service wires to the meter must be conduit. It should be placed in a location that isn't blocked by furniture or other obstructions. It must be at least two feet (2') from any exposed wiring on the side that is used for load and connected to the base of the meter with an entry cap on top of the conduit (see figure 16).

If the wires are not in conduit, then they should be routed through a weatherproof conduit, except if LES accepts a different route. The conduit should be in an area that is unobstructed by anything and is easily accessible by Company representatives to read the meter or conduct tests.

The meter base must be secured to block studs of concrete or brick. If the meter is going to be mounted on metal, vinyl or wood lap siding, an underlying of 3/4" thick outdoor plywood must be utilized. It should be installed in a level and plumb. It should be put in a spot in which the meter can be easily accessible by Company representatives for reading the meter, testing and maintenance.

Grounding Wire

Electricity meters come with the use of a grounding cable to protect the house from over-electricity. If an over-voltage or short circuit electricity occurs in the home, the grounding wire could assist in removing the electricity from the house and keep it from returning to the mains.

The grounding wire connects to the earth outside your home in one of two ways. It can be connected to an copper water pipe or an 8-foot long ground rod that is driven into the soil.

If the grounding wire isn't grounded, excess electrical energy can escape through other pathways into your home damaging appliances and electronics or an eventual house fire. It is essential to be aware of the causes of these issues to be able to avoid them.

A simple way to determine whether your outlets are grounded or not is to look at the prongs. Grounded outlets have three slots while ungrounded outlets have just two slots. The ground wire is connected to the d-shaped slot below the parallel slots.

Electrical currents are drawn to the solid mass of the earth beneath your feet because it has negative electrical charges. Ground wires are designed to let these positive charges find a safe place so they don’t become energized and cause trouble.

If your electric meter has not installed or repaired recently it is recommended that you contact your utility provider. They will be able check to see if it has been properly grounded. If it has not been installed, you should have an experienced electrician examine the meter and your system to make sure it's working correctly.

If you're choosing an electrician to install outdoor socket (mouse click the next document) your new meter, be aware that they must adhere to the rules and regulations set by your local utility company. They are responsible for protecting your home and keeping you safe.

In addition to connecting the ground wire to the base of the meter in addition, they must make sure that all metal casings of electrical installation companies loads are connected to neutral system. Otherwise, if there is an electrical fault on the neutral or hot wires, they can become active and contact the metal casings, which could trigger the breakers. This could lead to an electrical shock or even death.

The Meter Mechanism

The Meter Mechanism is the component of an electricity meter installation services that takes the actual measurement. It is usually located on an electric pole or inside the form of a box.

The metering mechanism in an electric meter usually made of aluminum that spins in response to changes in the coil's magnetic fields due to voltage and current. It spins at a speed that is proportional to how much electricity it consumes.

A spindle with gears attached to it supports an elongated disc of about a meter. The gears spin and display the energy utilized by series dials in kilowatt hours (kWh).

An electricity meter is comprised of three major components that include the disc, the mechanism for the disc, and finally, an LCD. The most important part of an electricity meter is the disc. It determines how much electricity consumed and how many kWh were consumed.

The meter needs to be calibrated according to a standard in order to obtain an accurate reading. This is usually done in a lab. In this process the meter is checked to ensure that it isn't over or undershooting the power or current of its circuit.

After the meter has been properly calibrated, it can be installed in a meter box. It is also connected to a reference voltage as well as a ground wire, and a grounding wire that leads from the box for the meter to a grounding rod that is placed in the ground.

Sometimes, a meter may export energy to the grid and its consumption. In these cases the meter will operate in reverse during periods of net export and decrease the total recorded energy consumption. This results in the customer being charged for the energy that is pumped through the meter and into the grid even if it's less than what's actually consumed at the meter.

The technician must connect the load cable and line to the terminals located at the neutral bus bar located in the center of the meterbox to ensure that the meter is operating properly. These wires are usually marked with white tape in order to show that they are neutral. After the wires are properly connected, they are tightened to ensure they are secure.